Rates 2025

Our Rates

2023

LOGO

***New rates starting January 2025***

*Payment terms: Haul & Launch Fee due day of haul. Balance due paid on day of launch or every 15 days*

*7% tax / 3.25% credit card fee not included

!Sorry we do not lend tools or yard boat!

 

 

 Special Bottom Job Pack’s:

*Pack 1 – $40 x ft– Haul out/in, light scrape, pressure wash, light sanding and 1 coat of bottom paint.

*Pack 2 – $41.50 x ft-Haul out/in, light scrape, pressure wash, light sanding and 2 coats of bottom paint.

*Pack 3- $83 x ft – Haul out/in, light scrape, pressure wash, strip bottom paint, 1 coat of epoxy primer, one coat of bottom paint.

Depositphotos 250326946 Stock Illustration Triangular Yellow Warning Sign Exclamation

  • All the services must be supervised and approved by the yard manager.
  • * Light scrape – the haul must be free of barnacles prior haul out. (check with manager for Diver availability).
  • * Light Sanding – additional fee will be charged in case if deep sanding its needed. (manager will advise you).
  • Any other service or materials not offered in the packages will be charged separately.
  • All the labor and material must be provided by the boatyard (check with manager if you have any request).
  • Any additional lay days will be charged separately after the package service its finished. (check rates below)
  • Bad weather/rainy days will be charged as normal.

 

 

 

Travel lift (60 ton – 20′ wide)

Haul & Launch

$14 × ft – monohull-Multihull

Pangas / small boats (contact manager)

$7 x ft <25′

$9 x ft > 25′

Quick Haul $11.00/ft

Basic scrape $1.50 x ft

Pressure wash $1.50 x ft

Other travel lift services $200.00 x hr + $20 x hr for extra workers

Labor

All services available: Painting, fiber glass, woodwork, electronics, electric, mechanic, hydraulic, canvas, sail repairs, rigging and more. Contact us for a quotation.

General yard labor $20 x hr (contact manager)

Fiber glass/epoxy work $30 x hr (contact manager)

Skilled Labor $37.50 to $45.00 (contact manager)

Wet sand blast $40 per bag (contact manager)

Outside contractors $15 per day each 

Lay days

Haul & Launch Days FREE

Working Area:

$0.75 x ft x day

$15 x ft x month

$12 x ft long term (3 Months or more with payment in advance)

Storage Area:

$11 × ft × month

$10 x ft long term (3 Months or more with payment in advance)

*contact manager for details

Electricity

Generator from 7:30am to 4:30pm – Monday to Friday $5/day

*we start to charge the electricity on haul out day.

R.e32902f90e441a729d911106fa0bd416?rik=Z6GNmudQJnN3Rw&riu=http%3a%2f%2fbodetechnicalservices.com%2fwp Content%2fuploads%2fpettibone Logo Border 1200x120025 ton telescopic Crane:

$125.00 x hr (1 hour min with operator) + $20 for extra workers

Diesel mechanic (contact manager)

$44.00 x hr

Paint and materials

In the Bocas Boatyard we offer PPG industries products https://www.ppg.com/
-Anti fouling Sigma ECO FLEET 530 https://www.ppgpmc.com/products/SIGMA-ECOFLEET-530
– Multi use Epoxy primer Sigma 200 https://www.ppgpmc.com/products/SIGMAPRIME-200-SERIES
Contact the manager for more info about  A nti fouling paint, PU paint, Epoxi primer or any other material.
We are Yanmar reps in Bocas Del Toro. Contact Fabian on +50766166000 for quotations.

 

Th?id=OIP.QL3gZuO4xbfPvsCoaDXVDQHaDZ&w=219&h=100&c=8&rs=1&qlt=90&o=6&pid=3WIFI Internet

Unlimited connection
$10 for password

*Payment terms: Haul & Launch Fee due day of haul. Balance due paid on day of launch or every 15 days*

*7% tax / 3.25% credit card fee not included.

!Sorry we do not lend tools or yard boat!